Double-click to start typing

TAUNTON TOWN Model Railway Club



       You are never too young (or too old) to enjoy model railways

***Garden O Gauge project***

         When does a patch scrub become a garden ?

             When does a patch scrub become a garden railway ?



                                          After a lot of hard work   !!!

***Gateway to our next lump of heaven!***

THE PROJECT OUTLINE.

THIS PROJECT IS ON HOLD.

We have agreement to take over the area of ground at the back of our club room. This area is about 100ft square and surrounded by brambles.


First step                                clear the scrub inside the brambles

second step                            full survey of the ground with levels

third step                                draw some sketch plans for the club agreement

fourth step                              draw up the agreed scheme

                             Start the build


Program of work, some work must be completed before the end of September !

             The drain run from the new loo to the interceptor and the boiler room for the club room.  Heating needs to be working by the end of September.

             This means that the drain run and the concrete base with the boiler room must be done by then or the clubroom could start to get damp.


NEW MEMBERS will be welcome to join and help with this project  please ring Graham or Pat for details 01823 327155.